2013.040.558
Print, Photographic
Sepia-toned photograph showing the peak of the tiled roof of Ford River Rouge Complex Building "B" during its construction. Piled tiles are waiting to be set. Material stockpiled for use on the ground below can be seen in the background. Verso: "Tile roofing on 1700 foot-long "B" bldg." Lower right hand corner shows photo number and date of photo: 22103-5-16-18. Photo mounted on a linen backing.
Request Image