Digital Collection
2018.039.090

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown. A stairway at the center of the photo leads to the upper level at the end of the furnace line. To the right of the stairs lies the entry end of the line. A portion of the welder, a wash tank, and a set of rollers can be seen. The Production Machinery (PM) logo is visible on the wash tank. Several tool carts and other pieces of the equipment can be seen on the floor in the foreground. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 5-8-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image