Digital Collection
2018.039.131

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The exit end of the two-level Continuous Annealing & Pickling (CAP) line is shown. A recoiler machine stands to the left behind its unfinished jack pit. A worker stands to the left of the recoiler. To the right is a set of rollers on a concrete base. The Production Machinery (PM) logo is seen on the machines. Other machinery is awaiting installation in the foreground. The upper level of the CAP line is seen in the background. A gantry crane track is visible above the upper level. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 3-11-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.