Print, Photographic
One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The entrance end of the two-level Continuous Annealing & Pickling (CAP) line is shown. A leveler is being installed in the foreground. Behind the leveler, the machines of the second line can be seen, including an uncoiler, second leveler, shearer, and rollers. The Production Machinery (PM) logo is visible on the machines. A pool of standing water is seen in the left foreground. Three metal cable trays can be seen above the line along the back wall. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 3-11-75 CONSTRUCTION PROGRESS".
Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.
Request Image