Print, Photographic
One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The entrance end of the two-level Continuous Annealing & Pickling (CAP) line is shown under construction. At the center right, an uncoiler and its open jack pit are partially visible behind a steel safety post and a metal drum. Further right are a leveler and shearer. Both machines stand on elevated concrete platforms. The Production Machinery (PM) logo can be seen on several machines. Three metal cable trays are visible along the wall in the upper background. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 2-27-75 CONSTRUCTION PROGRESS".
Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.
Request Image