Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. The furnaces and cooling area can be seen on the upper level. Workers sit on boxes in the background. On the lower level, two wooden spools can be seen on the floor as well as a metal cable tray and tool carts that are marked "Motor City Electric Co." and "La Planta 76." A tall stack of Babcock & Wilcox firebrick boxes stands on the lower level in the background. Beyond that, a hi-lo rests behind a stack of materials. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 2-27-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.