Digital Collection
2018.039.181

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. A series of support posts stands to the left. Beams awaiting installation are stacked on the floor. Several metal drums stand on the floor in the right foreground. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-16-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image