One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The entrance end of the two-level Continuous Annealing & Pickling (CAP) line is shown under construction. Workers can be seen in one of the open jack pits. Two welding tanks stand in front of the pit and a concrete safety post stands to the right. A metal frame stands behind the jack pit. Several workers can be seen in and around the frame. To the left of the frame, a ladder leans against the wall. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-16-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.