Digital Collection
2018.039.191

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at. The exit end of the two-level Continuous Annealing & Pickling (CAP) line is shown under construction. The floor is being prepared for concrete placement. Rebar can be seen protruding from the soil subgrade. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-2-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image