Digital Collection
2018.039.198

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. In the center background area of the photo, a control room is being built of cinder block. Scaffolding stands at the outer wall of the control room and a set of panels can be seen inside. A trench runs along the concrete floor at the far right side of the photograph. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-2-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image