One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. A portion of scaffolding can be seen on the right. To the left of the scaffolding are welding tanks. Beyond the tanks, a partially-constructed control room, built cinder block, can be seen. Two metal drums stand in front of the control room. On the left, wooden frames and other various materials are piled on the floor. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 12-19-74 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.