Digital Collection
2018.039.204

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. A control room for the two-level Continuous Annealing & Pickling (CAP) line is shown under construction. The partially-constructed cinder block wall is visible on the left. Two workers stand on scaffolding to the left of the wall. Inside the control room at the far end, two workers are welding. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 12-19-74 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image