Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. One of the control rooms of the two level Continuous Annealing & Pickling (CAP) line is shown under construction. Workers stand on scaffolding along the outer wall of the control room. Stacks of bricks stand on the floor. A wheelbarrow of bricks stands at the far end of the control room. Rebar is piled up to the left of the wheelbarrow. Several workers and the back end of a van stand at the far end of the line. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 12-19-74 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.