2013.042.568
Drawing, Technical
Bulkhead at Frame 56,
Str. [Steamer] No. 66
One drawing entitled "Bulkhead at Frame 56, Str. No. 66." The drawing consists of black ink on linen and shows a plan view of the bulkhead and dimensions at frame number 56. The drawing is shown at a scale of 3/4 inch = 1 foot and is dated November 3, 1893. Printed text along the bottom shows "C.S.B. Co. [Craig Ship Building Co.], Toledo." Handwritten text within a blue stamp in the lower right corner shows "New Drawing No. Tol. 66-S11-5-1, Tube No. 2."
Date
1893
Collection
Extent of Description
11.25" x 17.25"
Search Terms
Related Records
![Drawing, Technical - Full Size Sketch of Composition Hinges for Freeing Ports,
Str. [Steamer] No. 66](/sites/default/files/styles/430x323_1x/public/artifact-media/168/2013042575.jpg.webp?itok=_ttaESx-)
Drawing, Technical
2013.042.575Archive
Full Size Sketch of Composition Hinges for Freeing Ports,
Str. [Steamer] No. 66
![Drawing, Technical - Str. [Steamer] No. 66,
Full Size Section of Stem Showing Rabbet.](/sites/default/files/styles/430x323_1x/public/artifact-media/168/2013042578.jpg.webp?itok=Da1468hm)
Drawing, Technical
2013.042.578Archive
Str. [Steamer] No. 66,
Full Size Section of Stem Showing Rabbet.
![Drawing, Technical - Plan and Elevation of Boiler Foundation,
Str. [Steamer] No. 66](/sites/default/files/styles/430x323_1x/public/artifact-media/174/2013042591.jpg.webp?itok=j-G4gljl)
Drawing, Technical
2013.042.591Archive
Plan and Elevation of Boiler Foundation,
Str. [Steamer] No. 66