Print, Photographic
Black and white photographic print depicting part of the turbine bucket set-up in the Department #35 Process Laboratory at the Champion Spark Plug Co.
Caption on verso reads, "The bricks are first pressed in a hydraulic press which is not shown in photograph. The bricks are then trucked to the cut-off machine, which is shown at the left of the photograph and are sliced suitably for sizing on the surface grinder, shown at right of the cut-off machine. There the blanks are faced to length and the sides are ground to proper thickness and also made parallel. Next is shown the dust collector with the ducts running to each machine. Last is the three station turning machine. For close-up of front of this machine, see Photograph 170395."
Dated 2-10-1947